Gabon
Design, Engineering and Consultancy services for ...
Scope of Work
a. Site visit for collection of data (by 2 officials) from the existing Substations and to visualise the status of the proposed plot of the new Substation.
b. Review the site information including site plans and boundaries including considerations of following to optimize the land area requirement -
i. Terrain and topography of the land,
ii. Slope,
iii. Grid connection.
c. Preparation of Basic engineering drawings and calculations.
d. Detail engineering drawings for Electrical, Civil, Structural, Substation Automation System (SCADA based), PLCC, Fire protection and HVAC systems.
e. Preparation of Design calculations for Electrical, Civil, Structural, Fire protection and HVAC systems.
f. Fabrication & shop drawings for steel structures for Switchyard Equipment support, Gantry tower, Bus extensions etc.
g. Preparation of Bill of materials for Electrical, Civil, Structural, Mechanical and Automation systems.
h. Attending meetings with Client in remote online mode for any technical coordination.
i. Visit to Client’s office in Nigeria for attending various review and coordination meetings.
j. All drawings shall be submitted through email. Submission of hard copy of drawings is not considered.
k. Submission of As Built Drawings.