Jharkhand
Pile Foundation of all types of 220KV Multi...
Scope of Work :
The scope of work shall include undertaking the following Electrical power system studies using ETAP 19.0 software (minimum) for the Coke handling system of the BR-9 Expansion Project of Indian Oil Corporation Ltd. (IOCL) at Barauni. The scope shall also include attending meeting along with MBPL for obtaining approval from M/s Toyo Engg & M/s IOCL.
Power system studies shall include the following studies for the 6.6kV Switchgear, 415V SS-048-PMCC Switchgear and 415V SS-048-IMCC at S/S-048 :
a) Load flow study
b) Short circuit and earth fault study
c) Motor starting and re-acceleration study
d) Relay coordination study and Relay setting chart